S1000-FORWARD ETA, SD2000-FORWARD ETA & SPM, W1000-AFT ETA, …
Towing, Mooring and Anchoring
Emergency Towing Arrangements
S1000-FORWARD ETA, SD2000-FORWARD ETA & SPM, W1000-AFT ETA, W2000-AFT ETA
Product Description
S1000-FORWARD ETA - Emergency Towing Arrangement (Bow) for tankers over 20,000 DWT but under 50,000 DWT, - Chafing Chain: Material AM3, - SMIT Bracket: Material Grade A Steel, - Chock: Material ZG230-450 , - Seat for Bracket: Material Grade A Steel, , SD2000-FORWARD ETA & SPM - Emergency Towing Arrangement (Bow) for tankers of 50,000 DWT and above / Single Point Mooring System (Bow) for oil carriers over 100,000 DWT but not greater 150,000 DWT, - Chafing Chain: Material AM3, - Chain Stopper: Assembly, - Chock: Material ZG230-450 , - Chain Stopper Base: Material Grade A Steel, , W1000-AFT ETA - Emergency Towing Arrangement (Aft) for tankers over 20,000 DWT but under 50,000 DWT, - Towing Pennant: Assembly , - Chock/Strong Point: Material ZG230-450 , - Stopper Plate: Material Q345-A, , W2000-AFT ETA - Emergency Towing Arrangement (Aft) for tankers of 50,000 DWT and above, - Towing Pennant: Assembly , - Chock/Strong Point: Material ZG230-450 , - Stopper Plate: Material Q345-A
Product Ratings
S1000-FORWARD ETA | - Emergency Towing Arrangement (Bow): Safe Working Load 102 Tonnes | | SD2000-FORWARD ETA & SPM | - Emergency Towing Arrangement (Bow): Safe Working Load 204 Tonnes | - Single Point Mooring System (Bow): Safe Working Load 250 Tonnes | | W1000-AFT ETA | - Emergency Towing Arrangement (Aft): Safe Working Load 102 Tonnes | | W2000-AFT ETA | - Emergency Towing Arrangement (Aft): Safe Working Load 204 Tonnes
Applicable Standards
- Chapter II-1, Regulation 3-4 of SOLAS (2014 Consolidated Edition) as amended, IMO Resolution MSC 35(63) (adopted on 20 May 1994).
- OCIMF "Recommendations for Equipment Employed in the Bow Mooring of Conventional Tankers at Single Point Moorings", 4th Edition 2007.
- OCIMF "Mooring Equipment Guidelines (MEG3)", 3rd Edition 2008.
NA
NA